Skip to main content
SHANGCAI ClothingSHANGCAI Clothing
News Details

Sampling in Twelve Days: What We Changed

Sampling time is not one process, it is a stack of queues with a little work in between. When we mapped ours in August, a 21-day sample spent 15 of those days waiting for something.

The three queues

Fabric waiting for a decision. Swatches went out, the buyer chose on the third round, and the mill had already moved on to another lot. We now hold four core fleece and jersey qualities in stock in both 320 and 400 gsm, so round one of sampling does not touch a mill at all.

Panels waiting for a cutting slot. Sampling used to queue behind bulk on the knife table. The new laser room has its own slot every morning, which is where most of the gain came from.

Fit comments waiting for a call. Photos and measurements go out the same day the sample is sewn, in one message with the measurement sheet attached, rather than in an email thread.

The result

A one-colour hoodie from tech pack to shipped sample now runs 12 working days, and a two-piece set with a print 16. That is measured over the last 30 samples, not the best one.

← Back to News

Ready to price your next drop?

Send a tech pack, a reference photo, or just an idea. You do not need finished drawings to start.

How we work