Inside the New Laser Cutting Room
Two 3kW fibre lasers went live this month. Here is what changes for sampling speed, edge quality and the minimum order you can place.
Two 3kW fibre lasers went live this month. Here is what changes for sampling speed, edge quality and the minimum order you can place.
Our sampling lead time went from 21 days to 12. None of it came from working faster — it came from removing three queues.
400gsm is the number on every spec sheet this season. Here is what it looks like on a brushed-back fleece, and where the number stops meaning anything.
What a buyer’s quality team actually checks in a two-day factory audit, and the four documents worth having ready before they arrive.
We will be showing the spring range at Canton Fair this season, with the acid wash and puff print lines on the stand. If you are coming, message us beforehand and we will set aside time to walk you through the washing and printing lines.
A client audit runs from the cutting floor to final inspection. Here is what we prepare, and what you should ask to see. We keep the fabric test reports, wash test results and AQL inspection sheets from the last twelve months available on request.
Acid wash is the step most factories subcontract, and it is the step where a fade most often goes uneven. Keeping it in-house is what lets us hold a consistent fade across a full run rather than panel to panel.
Send a tech pack, a reference photo, or just an idea. You do not need finished drawings to start.
How we work