A Client Audit, From Cutting Floor to Final Inspection
We hosted four client audits this year. The pattern is consistent: the first half day is paperwork, the rest is the floor, and the finding almost always sits in the seam between the two.
The four documents
Fabric inspection records by lot, a cutting report that reconciles panels issued against panels sewn, the in-line inspection log, and the final AQL report. If those four agree with each other, the audit is usually uneventful.
On the floor
Auditors look for the same six things: needle policy and broken-needle log, machine guarding, the measurement station, the metal detector check, the quarantine area for rejects, and whether the line supervisor can explain the spec without leaving the line.
What we changed after the last one
Reject bins are now labelled with the operation number rather than just “reject”, so a defect can be traced to a station within a minute instead of a shift. It was a two-hour change that removed the most common minor finding.